Castello 1 Tunnel – A10 Genoa–Arenzano Motorway

 / 

Supply and installation of metallic armour-plate

Client

Autostrade per L’Italia

Year of completion

2022-2023

Works carried out

For the renovation of the Castello 1 Tunnel on the A10 motorway in the Genoa–Arenzano section, which is 52 meters long, excavated naturally, and features a two-lane carriageway with a width of 10.10 meters, Crezza was tasked with the construction and installation of metallic armour-plate throughout the length of the tunnel.

A total of 44 lining rings were designed and manufactured, each 1.20 meters wide, composed of 2 pier elements and 1 cap element, for a total of 132 precast components. After the milling, waterproofing, and construction of low walls carried out by the contractor, Crezza installed the components quickly, despite the very limited milling thickness.

The decision to adopt metallic armour-plate instead of the standard solution of precast segments was due to the higher stresses transmitted by the excavation section. Working with its partners, Crezza produced the metal framework in-house so to create a pre-assembled structure for on-site installation, made up of curved metal beams, sheets, and fasteners, and galvanized for greater durability.

Where this project is located

Related Projects

Crezza has also worked on:

Artificial Tunnels for Borgo Ticino Bypass

Supply and installation of segments for artificial tunnels

Hydraulic Safety Works – Genoa

Precast segments for tunnel lining

Brenner Base Tunnel

Lining for ISARCO underpass

Third Lane on A4 Motorway

Supply and installation of New Jersey H120 barriers

Motorway Safety Works – A4 Motorway Quarto d’Altino-Portogruaro Section

Supply and installation of road barriers for the central motorway divider

Alp Transit Gotthard

Sound-absorbing panels and railway platforms for the Ceneri Base Tunnel

Tunnel Descendant Ouest of Monaco

Precast false ceiling for smoke extraction duct with fire protection (REI)

Senago-Settimo Milanese floodway canal

Supply of precast slabs for the canal